July 25th

26 07 2010

This weekend several buildings who attend the church showed up Saturday and worked on framing out a few of the walls on the inside. One of them was in the main foyer area. It drops down from the ceiling of the high part to the level of the drop ceiling in the low part. The other part that was worked on was down at the foyer for the kids zone area. It will be an all hard ceiling above that area. This previous week another church member hung drywall down the entire west side of the hall way. Sure makes things look like they are coming together. Pearce and other contractors are still working on the grounds. They have done a great job of forming a curbing system all the way from Hale Lake road up to the parking lots. They have removed the jagged section between the lower lot and upper lot and will redo that, this is why that upper lot is closed for the time being. They are currently waiting on a company to come in a pour the concrete for the fire lane, then I think they/we will start on some landscaping.

This slideshow requires JavaScript.

Advertisement

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s




Follow

Get every new post delivered to your Inbox.